Service Manual Transistor Technical Articles CD Download Register Member Login Exit Sign
Home A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
. TV  .  Camera  .  Video camera  .  Notebook  .  Audio  .  Monitor  .  Projector  .  Air conditioning  .  Refrigerator  .  Printer  .  Duplicator  .  Fax machine  .  Mobile  .  Telephone  .  Washing machine  .  Cooker  .  Microwave  .  Other  .  
Your current location£ºHome > Technical Articles > Air conditioning

Check the Events after the air conditioner installation

Time£º2014-01-28 10:18:05  Source£ºNetwork  Author£ºUnknown  Clicks£º1261
  

 After the air conditioner is installed, you should check the following: vNkservice manual download site

 
1) check the power supply voltage is 220V. 
 
2) control switch of the indoor unit allocated to the "stop" position, and the thermostat switch to labeled "low" position on the scale card. 
 
3) Turn on the power, the control switch to the "strong wind" position, turn the unit off. Fans observe the work of the air conditioning unit, then there should be no noticeable impact sound or noise. 
 
4) The switch to "high cold" file to see whether the unit started cooling operation.